DESIGN PROCESS

The service we can provide enables EDG:Architecture to undertake projects throughout the UK, and across all stages of the RIBA Plan Of Work. You can choose whether our involvement is early design stage only, or a full start-to-finish package.


IMG_3356.JPG

stage 0-2: Concept Design

Initial consultation

Strategic brief development

Measured Survey

Concept Design


elevation resi.jpg

Stage 3:

developed design and planning

Developed Design

Pre-Application advice/discussion

Planning Application (if required)

Permitted Development/Prior Notification.

Design Risk Assessment (CDM 2015)


Stage 4:

Technical Design, Building Regulations, and Tender

Technical design drawings with construction detail .

Liaising with Structural Engineers (and other appointed consultants as applicable)

Building Control application

Liaising with the Building Inspector to ensure compliance with the Building Regulations.

Written technical specification

Prepare Construction drawings

Prepare tender packages to obtain a price for the works

Pre-Construction Health & Safety File


02 Extension.jpg

Stage 5: On site supervision

Ensuring that the build is in accordance with the approved drawings where possible

Assessing Valuations submitted by the PC, and issuing progress payment certificates

Issuing Architect’s Instructions for variations

Assessing claims for an extension of time

Preparing additional drawings and details as required on site.

Dispute resolution (in the unlikely event of a dispute)

Undertaking a regular visit, and minuted site meeting